With the depletion of the Earth’s resources, environmental awareness has increased significantly. The government is now fully supporting the construction of home photovoltaic solar power generation systems. At present, home solar power generation systems are popular generating devices. Solar photovoltaic power generation can be established wherever sunlight is available for the home solar power station. Currently, many users are installing grid-connected photovoltaic solar power systems. After setting up a small power station at home, support from the power supply department is needed to achieve grid connection.
There are seven steps to connect your home solar power station to the grid:
1. Apply for a grid-connected photovoltaic power generation. An application needs to be made at the electric utility’s service hall, where an application for grid connection must be filled out. Required documents include the homeowner’s ID card and copies, household registration book, property title, and other relevant documents.
2. The power supply department will conduct an on-site inspection and provide a personalized grid connection plan within 10 working days.
3. Based on the grid connection plan, the household will carry out detailed design for the photovoltaic power station, and the family will confirm the grid connection plan.
4. Purchase equipment according to relevant technical requirements. Generally, a household needs a capacity of 5 to 6 kilowatts, which is usually sufficient. Professional installers should be contacted for installation.
5. Submit an application for grid connection debugging. The power supply enterprise will install a metering device, organize acceptance, and sign the relevant agreement. After testing, the grid connection will be officially completed.
The application for a home solar power station grid connection is free of charge. Once the personal grid connection with the national grid is completed, excess electricity generated from the home solar system can be sold to the state, allowing for certain subsidies. This helps to recover the household’s costs more quickly. Additionally, for solar grid connection projects of 380 volts and below, the power supply department promises to complete the grid connection process within 35 working days. Grid connection projects of 10 kilovolts are promised to be completed within 45 working days.
The solar manufacturer specializes in the research and production of solar street lamp products and photovoltaic power system equipment installation design. If you want to learn more or purchase solar photovoltaic panels, please click to contact our online customer service.