
Solar street lamps require careful consideration during the foundation pouring stage: determine the position for the solar street lamp and assess the geological conditions.
If the surface soil is soft from 1 to 2 meters deep, the excavation depth should be increased. Additionally, confirm that there are no other facilities beneath the excavation area, and ensure that there are no objects that will block sunlight from the top of the solar street lamp for an extended period. If there are such objects, the position must be adjusted.
Reserve a hole that meets the standards of 1 to 3 meters for the installation of the solar street lamp. Place the embedded components in the center of the square hole and ensure that the PVC conduit has one end positioned in the center of the embedded part and the other end connected to the battery storage area.
It is important to keep the embedded components, foundation, and original ground level aligned, with one side parallel to the road, to ensure that the lamp post stands upright and does not lean.
Afterward, use C20 concrete for fixing the structure. During the pouring process, continuously vibrate the concrete with a vibrating tool to ensure overall density and stability.
Once the construction is complete, promptly clear any residual debris from the positioning board and clean any impurities from the bolts with waste oil. During the solidification of the concrete, regular watering is necessary for curing. Installation of the solar street lamp can only proceed after the concrete has fully set.
For more information about the solar street lamp price list, please feel free to inquire. Bitpott Solar Street Lamp Manufacturer specializes in the research, development, production, and sales of solar LED outdoor lighting fixtures, with years of production experience and advanced equipment, ensuring quality, reasonable pricing, and configurations. For inquiries regarding LED solar street lamp prices, please contact our online customer service.
Welcome to place your order!