To properly install a set of
Bitpott solar street lights
, we must first lay a solid foundation; otherwise, it can easily collapse, causing inconvenience rather than benefits. In any project, the foundation is always of utmost importance, just like building a house—without a foundation, a good house cannot be constructed. Different solar lights have varying heights and wind resistance, thus requiring different foundation strengths. During construction, ensure that the foundation strength and structure meet design requirements. Construction personnel can question unreasonable selections of installation sites based on site conditions and halt construction, reporting the situation to the relevant authorities. Necessary rectifications must be completed within the set timeframe, following actual construction standards. The installation steps for the solar street light base are as follows:
1. Excavate the pit along the road direction according to the dimensions of the
solar street light foundation diagram
(the construction personnel determine the construction size).
2. Ensure that the upper surface of the ground cage is level (using a level for measurement) and that the anchor bolts within the cage are vertical to the upper surface of the foundation (using a square for measurement).
3. After excavation, allow the pit to rest for 1-2 days to observe if there is any underground water seepage. If there is seepage, stop construction immediately.
4. Prepare the necessary tools for constructing the solar street light foundation and select personnel with construction experience before starting.
5. Use appropriate cement according to the
solar street light
foundation diagram. Special acid and alkali-resistant cement may be necessary in areas with high soil acidity or alkalinity. The fine sand and gravel must be free from impurities like soil that could affect the concrete strength.
6. The surrounding soil of the foundation must be compacted properly.
7. The bottom of the battery compartment in the foundation should include drainage holes or comply with drawing requirements.
8. Before construction, both ends of the conduit must be sealed to prevent foreign materials from entering and blocking, making it difficult or impossible to pull cables during installation.
9. Cure the solar street light foundation for 5-7 days after completion (depending on weather conditions).
10. Only install the solar street light after the foundation has passed inspection.
Street Lights—